FORENT ENERGY EQUIPMENT RENTALS USA Remote workforce housing and camp site checklist Call 888-385-5513 — 24 hours a day, 7 days a week https://forentenergy.com/site-planning Use this checklist with your project or property contact, then include the confirmed details in your rental inquiry. It does not reserve equipment. 1. PEOPLE AND SLEEPING SPACE Project / assignment: Workers staying overnight, by phase: Shift pattern and overlapping changeovers: Shared or separate-room preferences: Bed arrangement and privacy requirements: Personal storage needs: Existing accommodation / facilities the crew can use: 2. DATES AND RECEIVING PROPERTY Requested rental start / end: Confirmed work phase: Actual receiving address (separate from work address if different): Property / project contact and phone: Person authorized to receive the equipment: Proposed placement area and access information: Delivery / collection windows to discuss: Any planned changes to access, utilities or unit position: 3. SELECTED EQUIPMENT AND CONNECTIONS Accommodation configuration(s) to compare: Actual occupancy and included bed layout to confirm: Electrical voltage, phase and amperage at the proposed position: Available electrical connection information: Potable-water connection information: Wastewater collection / disposal arrangements: Who is responsible for site connections and servicing: Applicable local approvals and responsible contact: Do not borrow another model's electrical rating or assume missing phase, capacity, water or wastewater requirements. Confirm the selected units. 4. SUPPORTING FACILITIES Existing showers / restrooms available to contractors: Additional standalone shower / shower-restroom / restroom needs: Existing laundry and any additional laundry requirement: Existing crew meal facilities: Mobile kitchen / dishwashing requirements if facilities are unavailable: Emergency refrigeration needs if permanent cold equipment has failed: Periods when existing amenities will be interrupted: 5. ITEMS TO CONFIRM IN THE WRITTEN QUOTE Equipment and actual configuration / occupancy Availability and rental / lease period Billing basis and any minimum term Delivery access and dates Placement, setup responsibilities and collection Site connections, servicing responsibilities and applicable approvals Included equipment, exclusions, delivery / setup charges and tax Site preparation and approvals are separate from typical equipment setup. Public project records and road-condition links do not establish delivery clearance or authorize trailer placement on a property.