Past emergency for Sacramento projects
Recovery after the 2023 severe storm declaration (FEMA DR-4699)
FEMA's declaration records list "Severe Winter Storms, Straight-Line Winds, Flooding, Landslides, And Mudslides" (DR-4699) as a major disaster declaration for Sacramento County. The incident began on February 21, 2023 and ended on July 10, 2023, and the declaration was made on April 3, 2023. This is a county-level record for Sacramento planning. For a similar storm recovery, identify overnight crews and any interruption to existing washing or meal facilities before sizing a temporary camp. A past event does not mean there is a need today.
Source: FEMA declaration DR-4699, Federal Emergency Management Agency, OpenFEMA
Major construction for Sacramento projects
POWER LINE ROAD PHASE 2 (PLR2/ER-1)
Power Line Road Phase 2 combines road widening with potable-water and storm-drain work. The description covers roughly 4,900 linear feet and relocation of twenty utility poles. Several trades can therefore have different work fronts within the recorded project scope; the notice does not give their staffing or accommodation arrangements.
What to confirm for your crew
For comparable road-and-utility work, give the rental inquiry a crew count for each rotation and a proposed receiving location. Ask the project manager whether the crew base would stay in one place as work advances. New permanent water infrastructure should not be assumed to provide a temporary camp connection before it is available for use.
CEQAnet received a Notice of Determination from Sacramento County on January 15, 2026, recording an approval date of January 13, 2026, for "POWER LINE ROAD PHASE 2 (PLR2/ER-1)" in Sacramento. The determination filing does not establish the current work phase; confirm the schedule with the project owner.
Source: CEQAnet document 1992032074/20, Sacramento County
Major renovation for Sacramento projects
Surgery & Emergency Services Pavilion (SESP) Chem Line Lab Remodel and Equipment Replacement
The UC Davis Health laboratory remodel is within existing space in the Surgery and Emergency Services Pavilion. Its scope includes replacement analyzers, benches and workstations, together with water connections, electrical and IT changes, HVAC repairs and restroom modifications. The exemption describes negligible or no expansion of the existing use.
What to confirm for your crew
For an assignment with this mix of interior work, ask the facilities manager which contractor amenities remain available and where rental equipment could be received. Accommodation would be for the identified workforce. Establish any washroom or meal-service interruption before adding supporting trailers, rather than deriving a camp size from the laboratory equipment list.
CEQAnet received a Notice of Exemption from University of California, Davis on September 15, 2026, for "Surgery & Emergency Services Pavilion (SESP) Chem Line Lab Remodel and Equipment Replacement" in Sacramento, near X Street and 45th Street. The exemption filing alone does not establish the current work phase; confirm the schedule with the project owner.
Source: CEQAnet document 2026090604, University of California, Davis
Equipment access for Sacramento projects
Emergency access: official information and road checks
Cal OES places Sacramento County in Mutual Aid Region IV, part of its Inland Administrative Region, based in Sacramento. During complex emergencies such as wildfires, floods and earthquakes, Cal OES regional staff work alongside local emergency managers in county or city Emergency Operations Centers to coordinate state resources. Before a trailer delivery, check live road conditions: Caltrans QuickMap shows real-time traffic cameras, lane closures and road conditions. Use these public emergency-management and road resources when checking the site. Delivery access and dates for your Sacramento site are confirmed in the written quote.
Source: Inland Region, California Governor's Office of Emergency Services; QuickMap, California Department of Transportation
The starting prices below apply to every California location, including Sacramento. Delivery, setup and collection to your site, tax and minimum term are confirmed on your written quote.
Starting prices only, in US dollars, from our rate sheet. Daily and monthly rates are starting references. Your written quote confirms the rental price, billing terms, delivery, setup, collection, tax and any minimum term.