Alberta locations
Alberta Remote Man Camp & Shower and Restroom Combo Trailer Rentals by Region and Town
Forent Energy Equipment Rentals rents remote man camp and shower and restroom combo trailers to energy, construction and utility crews across Alberta, from Fox Creek in the Greenview area through Hinton in the foothills to Taber in the south. Life Support Service for a remote man camp or workforce housing site can combine sleeper and bunk bed trailers, shower trailers, shower and restroom combo trailers, standalone restroom trailers and laundry trailers with mobile commercial kitchens, commercial dishwashing trailers and emergency refrigeration, including walk-in coolers and freezers when permanent equipment fails. Choose your region and town below for a local guide, or call any hour. We can help coordinate equipment selection, delivery and setup for short-term rentals and long-term leases, and we are ready to check availability and quote your site.

Alberta regions at a glance
Use + and − to zoom, then drag or use the arrow buttons to move around. With the map focused, use +/−, arrow keys and Home to reset.
Every dot is a town, village or summer village: hover to identify it and click to open its page. On touch, tap once to preview and again to open. The ten numbered markers are keyboard links, and the search box and directory reach every city.
Selected place
Fox Creek
Town of Fox Creek · Greenview area (Fox Creek and Valleyview)
Open Fox Creek rental page- Fox Creek
Town of Fox Creek
Greenview area (Fox Creek and Valleyview) - Whitecourt
Town of Whitecourt
Whitecourt and Westlock area - Hinton
Town of Hinton
Hinton and Edson area - Drayton Valley
Town of Drayton Valley
Edmonton region - Slave Lake
Town of Slave Lake
Slave Lake and Mackenzie County - Peace River
Town of Peace River
Grande Prairie and Peace River area - Bonnyville
Town of Bonnyville
Cold Lake and Bonnyville area - Rocky Mountain House
Town of Rocky Mountain House
Rocky Mountain House area - Drumheller
Town of Drumheller
Drumheller and Wheatland area - Taber
Town of Taber
Lethbridge area
All locations
Remote workforce housing rentals in 229 Alberta towns, villages and summer villages across 19 regions
Towns, villages and summer villages with fewer than 10,000 people: Statistics Canada, Table 98-10-0002-01, 2021 Census population and dwelling counts. Regions are Alberta’s census divisions. Alberta’s cities all have 10,000 or more people and are not listed as separate guides; a camp for any of them is quoted for the actual site.
Equipment photos
Camp equipment we quote across Alberta

Another shared-room layout
Compare this sleeping arrangement with separate-room options before choosing accommodation for overlapping shifts.

Handwashing facility
Consider handwashing points alongside the camp circulation plan. Dimensions and utility requirements need configuration confirmation.

Kitchen working area
An interior view helps you discuss preparation, cooking and washing areas with the appliance schedule for the selected unit.
Photos show equipment layouts and do not confirm current stock. Availability and the exact configuration are confirmed on your written quote.
Rental terms for Alberta
- Rental periods
- Weekly and monthly; longer leases by quote
- Hours
- 24 hours a day, 7 days a week
- Delivery time
- Dates confirmed in your Alberta quote
- GPS tracking
- Possible on request
- Typical setup
- Most units: about 1 hour. Kitchens/dishwashing: about 5 hours.
- Access setup
- Ramps: 4–6 hours. Stairs: 5–15 minutes.
Alberta planning references
Local context for a crew-facility plan
These public examples help frame the questions for your own assignment. They do not describe Forent customer projects or establish equipment availability.
1. Past emergency
The 2011 Slave Lake wildfire
Alberta's wildfire page records that on May 15, 2011, a Flat Top Complex wildfire entered the Town of Slave Lake and destroyed over 400 buildings. For a comparable recovery assignment, identify the people staying overnight before choosing a sleeping layout and supporting camp facilities. This is historical context, not evidence of current demand.
Source: Wildfire maps and data (2011 Flat Top Complex, Slave Lake), Government of Alberta.
2. Major construction
Highway 3 twinning near Taber
Alberta Transportation and Economic Corridors describes the Highway 3 upgrade from the Town of Taber to west of Burdett, with a schedule running through summer 2026. A highway work limit is separate from the property receiving accommodation. Quote beds for the actual contractor rotation and base address.
Source: Highway 3 twinning (Taber to Burdett), Government of Alberta, Transportation and Economic Corridors.
3. Major renovation
A correctional centre renovation at Peace River
A June 2026 Government of Alberta tender sought construction services to convert unused space and replace the HVAC system in the Peace River Correctional Centre's main building. A building's permanent occupancy does not size contractor housing. Confirm overnight workers and the place available for their accommodation. Confirm the current work phase with the project owner.
Source: RFP for Fixed Price Construction Services for Peace River Correctional Centre - Main Building Utilization Improvement and HVAC Restore (AB-2026-04150), Government of Alberta, Infrastructure, via CanadaBuys.
4. Equipment access
Official information and the actual receiving site
Consult the Alberta Emergency Management Agency, Alberta Emergency Alert and 511 Alberta road conditions. Public emergency resources are separate from a rental delivery arrangement. Actual delivery access and dates for the receiving property are confirmed in your written quote.
5. Local rental costs
20 ft accommodation unit (shared, contractor or VIP): supplied starting references
Monthly: from $3,495. Daily: from $2,995. One starting-reference schedule, in Canadian dollars, applies across Alberta. These supplied rate-sheet figures do not establish a project total. Confirm the actual equipment, billing basis, minimum term, delivery, collection, setup and taxes including GST in the quote.
Compare this monthly starting rate
Why choose Forent Energy
Why crews choose Forent Energy Equipment Rentals
Alberta coverage is a starting point for an accommodation inquiry. Your receiving property, overnight roster and work dates determine the equipment discussion; a city guide or map marker does not confirm stock or delivery access.
Accelerated Deployment
Provide the receiving address and available connections so delivery can be discussed for the specific Alberta assignment.
24/7 Emergency Service
The 24-hour line receives urgent workforce-facility inquiries from the project contact.
End-to-End Project Support
Build the local sleeping plan around crew rotations and the amenities already available at the base.
Flexible Rental Solutions
Use the same supplied rate references across Alberta, with dates, delivery and any minimum term confirmed by quote.
Heavy-Duty Commercial Equipment
Compare documented configurations before selecting units for the site's occupancy and utility requirements.
Experienced Logistics Coordination
Use official road and emergency information alongside quote-confirmed access, placement and collection arrangements.
Why clients trust us
Our line is open 24 hours a day, 7 days a week. We rent to commercial and industrial customers, including construction contractors, industrial cleanup crews, utilities, government agencies and emergency response teams. Delivery, setup, rental term and pricing are written into your quote before equipment moves.